Cases

Here is a couple of actual cases -proving the effectiveness and success of the product so far

Albertslund

Builder: HOFOR (Metropolitan Supply), Copenhagen.
Problem: Storm water handling in open channel.
Solution: Installation of AquaBlokk™ horisontal gate for controlled bypass to a lake nearby.
Type & measurements: Width 10 m. Movement: 0.8 m.
Technical data: 2 x 0.75 kW. IP69 motor, Water flow: 10.5-11 m3/sec.
(submersible motors with gearbox)

Slagelse Kommune (Slagelse Municipality)

Builder: SK Spildevand.
Problem: Missing possibilities for damming the water in the lake at storm water.
Solution: Installation of AquaBlokk™ horisontal gate for controlled bypass to a lake nearby.
Type & Measurements: Width: 6 m. Movement: 0.4 m.
Technical data: 2 x 0.75 kW. IP69 motor, Water flow: 2.3-2.5 m3/sec.

Silkeborg Kommune (Silkeborg Municipality)

Builder: Silkeborg Kommune (Silkeborg Municipality).
Problem: Regulation of Gudenåen (one of the biggest rivers in Denmark) and the water level in Silkeborg marina.
Solution: Installation of 4 pcs. AquaBlokk™ horisontal gates for controlled bypass to below river/lake. Hereby the level of the marina can be controlled within a tolerance of ±10 mm.
Type & Measurements: Width: 10 m. Movement: 0.9 m.
Technical data: 2 x 3 kW. IP69 motor, Water flow: 13-14 m3/sec x 4.

Get in touchWe would like to hear from you!